Post your ideas, questions, or feedback.

Allow Re-Sequence a Routing

Elliott Work Order Plus allows user to change the Operation ID but if user wants to re-sequence a routing a manual change for each operation id is required (from the last operation going back). Elliott should allow a re-sequence similar to the BOM Product structure. Thanks, Avi.

3 votes
Sign in
Signed in as (Sign out)

We’ll send you updates on this idea

Avi Weissbard - Cybermac software LLC shared this idea  ·   ·  Admin →

0 comments

Sign in
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base