Allow Re-Sequence a Routing
Elliott Work Order Plus allows user to change the Operation ID but if user wants to re-sequence a routing a manual change for each operation id is required (from the last operation going back). Elliott should allow a re-sequence similar to the BOM Product structure. Thanks, Avi.
3
votes
![](https://secure.gravatar.com/avatar/342ab2c025805670105fe3c75c82f2d6?size=40&default=https%3A%2F%2Fassets.uvcdn.com%2Fpkg%2Fadmin%2Ficons%2Fuser_70-6bcf9e08938533adb9bac95c3e487cb2a6d4a32f890ca6fdc82e3072e0ea0368.png)