Allow Re-Sequence a Routing
Elliott Work Order Plus allows user to change the Operation ID but if user wants to re-sequence a routing a manual change for each operation id is required (from the last operation going back). Elliott should allow a re-sequence similar to the BOM Product structure. Thanks, Avi.
3
votes
Avi Weissbard - Cybermac software LLC
shared this idea