Use F2=Labor Only When Report Zero Qty in Plus Work Order Time Clock Reporting
In Plus Work Order, Work Order Production Reporting for the time clock operation, user can choose "Qty Completed" = 0. This will stop the time clock for that either that operation, or previous operation (depend on what operation was previously working on). If user choose to report Qty Completed = 0, then there is no Production Transaction created. As a result, the WIP and accounting side will not be updated. If user wish to create production transaction to so WIP is created, user can Press F2 key which means to report "Labor Only".
It is suggested that some users would like to make F2=Labor Only as the default, so it is less likely for the operator to make mistake by forgetting to press the F2. Therefore, we shall introduce a global setup flag in BOMP Global Control:
* Create Zero Completed Production Trx in Work Order Time Clock (No F2 Key Needed)?
The default is "N". If this flag is set to "Y", then during BOMP Work Order Time Clock Operation, and when user choose to report production, but the Qty Completed = 0, it is as if the F2=Labor Only key is pressed. See attached sample screen.