Allow to run Coasted BOM with no output
When running the Coasted BOM as Deferred Processing (Probabely with the option to update the cost) an email cannot be sent because of the size of the output. Adding an option on the report parameters not to print the details and replace the report with a message "Coasted BOM was completed" will resolve the issue. Another alternative is to change the email option under the Deferred Processing and allow not to send an attachment,
You don't need to email the report when running defer processing. There maybe some miss understanding here. Can you verify the defer processing? if the email option is turned on, you can simply turn it off.
-
Avi Weissbard - Cybermac software LLC commented
I want and email to be sent "Costed BOM was completed", so the controller sees that it is done.