Feature - Item Selection in Cost Master Maintenance
Release date: 9/27/17
Standard Product Costing allows the user to enter up to 8 specific item numbers or a range of item numbers in various applications. This functionality has been added to several Cost Master Maintenance applications in BOMP.
A new F1 = Enter Selection of Item Numbers option has been added. This option is accessed from the Starting Item Number field. If pressed, the user will have the option to enter up to 8 individual item numbers instead of using a range of item numbers.
A new F1 = Enter Selection of Item Numbers option has been added. This option is accessed from the Starting Item Number field. If pressed, the user will have the option to enter up to 8 individual item numbers instead of using a range of item numbers.
If the user chooses to enter selected items, at least one item needs to be entered. There is no support for "All" when entering specific items.
The following functions have been enhanced with this modification:
Roll Last Cost to Current V/A Material Cost
Current Total Cost Buildup
Current to Standard Roll
Cost Explosion Report
Modified Programs:
BMROLCSS.CBL, CCRANGEX.PL, BMROLCST.WS, BMROLCST.CBL, BMBLDCSS.CBL, BMBLDCST.WS, BMBLDCST.CBL, BMSTDCSS.CBL, BMSTDCST.WS, BMSTDCST.CBL, BMCSEXPS.CBL, BMCSEXPP.WS, BMCSEXPP.CBL