Skip to content

Work Order Plus Setup Manual: Index

Due to the size of the document entitled "Work Order Plus Setup Manual," we have divided it into several sections within the Knowledge Base. What follows is an index listing the contents of each section, along with a link to each one.

Work Order Plus Setup Manual 1

  • Introduction
  • Chapter 1: Chart of Accounts
  • Chapter 2: BOMP Setup Department

Work Order Plus Setup Manual 2

  • Chapter 3: IM Setup
  • Chapter 4: BOMP Global Setup

Work Order Plus Setup Manual 3

  • Chapter 5: Time Clock Global Setup
  • Chapter 6: COP Order Line Global Setup
  • Chapter Security Setup

Work Order Plus Setup Manual 4

  • Chapter 8: Shop Setup
  • 8.1 Labor Grade
  • 8.2 Department
  • 8.3 Work Center
  • 8.4 Operation ID
  • 8.5 Production Routing
  • 8.6 Product Structure
  • 8.7 Shift ID

Work Order Plus Setup Manual 5

  • 8.8 Operator ID
  • 8.8.1 Operator Security Control
  • 8.8.2 Operator ID for Elliott User

Work Order Plus Setup Manual 6

  • 8.9 Special Operation
  • 8.10 Base Work Order
  • Chapter 9: Advanced Feature
  • 9.1 Mass Update Operations
  • 9.2 Routing Import
  • 9.3 Routing Export
  • 9.4 Routing Export from SPR
  • FAQ

Feedback and Knowledge Base