Skip to content

Feature - Show User Assigned Staging Batches At Top of Staging Verification List

Release Date - 12/5/2020

Version: 8.5 and Above

When a warehouse user accesses the Staging Verification screen, any staging batches assigned to the user were shown at the bottom of the list. With this feature the staging batches that are assigned to the user running the application are shown at the top of the list in assigned priority order. Any unassigned staging batches are listed below the assigned batches.



Programs Modified: CPBATSUM
CLS

Feedback and Knowledge Base