BM30S1 Bill of Material Engineering Change History Report
Engineering Change History Report
Application Overview
The Engineering Change History Report prints a record of engineering changes made to parent items in the Product Structure File through Engineering Change Processing and the Post Engineering Changes applications.
It provides information about each change, including the engineering change number; description of the change and which sequence numbers and components were affected. Also provided are the date the change was supposed to become effective and the date it was posted. The user may choose to print the report and to purge the Engineering Change File. Changes to be included in the report may be selected by change number and/or parent item number. The user may also set a cutoff date for changes posted to the Product Structure File. Any changes posted after the cutoff date will be excluded from the report.
Run Instructions
Select Engineering Change History Report from the pull down BOMP Reports window. The following screen will then be displayed:
Engineering Change History Report
The following options are available:
- Select the desired mode from the Engineering Change History Report menu bar.
- Enter the data requested on the screen.
To return to the menu bar, press the ESC or F10 key. To leave this application, press X for EXIT when positioned at the menu bar.
Entry Field Descriptions
Name | Type and Description |
1. Print Report? | Y or N. Enter Y to print the report. Enter N if you do not wish to have the report printed but do wish to purge the data file. The default is Y. |
2. Purge File ? | Y or N. Enter Y if you wish to have the Engineering Change History File purged for the range selected. Enter N if you wish to have all data in the Engineering Change History File retained for future reference. The default is N. |
3. Starting Change No | 6 numeric digits. Enter the first engineering change number to appear on the report. The default is All. |
4. Ending Change No | 6 numeric digits. Enter the last engineering change number to appear on the report. This field defaults to the starting job number. |
5. Starting Parent Item No | 15 alphanumeric characters. Enter the starting parent item number for the range of items to appear on the report. The default is All. |
6. Ending Parent Item No | 15 alphanumeric characters. Enter the ending parent item number for the range of items to appear on the report. The default is the starting parent item number. |
7. Posting Date Cutoff | A date in the standard date format. Enter the posting cutoff date you wish to use for printing the report. Engineering changes posted after this date will not be printed. The default is All. |
Engineer Change History Report
E N G I N E E R I N G C H A N G E H I S T O R Y R E P O R T
Ranges: All Changes
All Parent Items
All Dates Posted
Change No Change Description Parent Item Parent Description Effective Date Date Posted
9001 CPU Information change. May PC Parent Item (Mother Board) 02/25/92 02/25/92
redirect operation option if Personal Computer
necessary. Status is optional.
Seq Action Component Item Qty Per Um Component Description Llc Attch Scrap Act Stk Ctl P/M Eff Date Posting Note
10 C CPU 1.000000 EA Mother Board For Parent 1 30 .0 A Y Y M Changed
Central Processing
CPU 386 operation position 30. Maintain inspection status
for sub‑assembly CPU. Operation position is portable as
needed. Inspection operation may need additional queue.
1 Changes Printed