Skip to content

BM30S1 Bill of Material Engineering Change History Report

Engineering Change History Report

Application Overview

 

The Engineering Change History Report prints a record of engineering changes made to parent items in the Product Structure File through Engineering Change Processing and the Post Engineering Changes applications.

 

It provides information about each change, including the engineering change number; description of the change and which sequence numbers and components were affected.  Also provided are the date the change was supposed to become effective and the date it was posted.  The user may choose to print the report and to purge the Engineering Change File.  Changes to be included in the report may be selected by change number and/or parent item number.  The user may also set a cutoff date for changes posted to the Product Structure File.  Any changes posted after the cutoff date will be excluded from the report.

 

Run Instructions

 

      Select Engineering Change History Report from the pull down BOMP Reports window.  The following screen will then be displayed:

 

 

Engineering Change History Report

 

 

 The following options are available:

    • Select the desired mode from the Engineering Change History Report menu bar.
    • Enter the data requested on the screen.

     

          To return to the menu bar, press the ESC or F10 key. To leave this application, press X for EXIT when positioned at the menu bar.

     

    Entry Field Descriptions

     

    Name

    Type and Description

    1.      Print Report?

    Y or N.

    Enter Y to print the report.  Enter N if you do not wish to have the report printed but do wish to purge the data file.  The default is Y.

    2.      Purge File ?

    Y or N.

    Enter Y if you wish to have the Engineering Change History File purged for the range selected.  Enter N if you wish to have all data in the Engineering Change History File retained for future reference.  The default is N.

    3.      Starting Change No

    6 numeric digits.

    Enter the first engineering change number to appear on the report.  The default is All.

    4.      Ending Change No

    6 numeric digits.

    Enter the last engineering change number to appear on the report.  This field defaults to the starting job number.

    5.      Starting Parent Item No

    15 alphanumeric characters.

    Enter the starting parent item number for the range of items to appear on the report.  The default is All.

    6.      Ending Parent Item No

    15 alphanumeric characters.

    Enter the ending parent item number for the range of items to appear on the report.  The default is the starting parent item number.

    7.      Posting Date Cutoff

    A date in the standard date format.

    Enter the posting cutoff date you wish to use for printing the report.  Engineering changes posted after this date will not be printed. 

    The default is All.

     



     

    Engineer Change History Report

     

     

                                     E N G I N E E R I N G   C H A N G E   H I S T O R Y   R E P O R T

     Ranges: All Changes

            All Parent Items

            All Dates Posted

    Change No  Change Description               Parent Item     Parent Description             Effective Date  Date Posted

       9001    CPU Information change.  May     PC              Parent Item (Mother Board)        02/25/92       02/25/92

               redirect operation option if                     Personal Computer

               necessary. Status is optional.

    Seq Action Component Item      Qty Per  Um Component Description         Llc Attch Scrap Act Stk Ctl P/M Eff Date  Posting Note

     10   C    CPU                 1.000000 EA Mother Board For Parent         1   30    .0   A   Y   Y   M            Changed

                                               Central Processing

                                               CPU 386 operation position 30. Maintain inspection status

                                               for sub‑assembly CPU. Operation position is portable as

                                               needed. Inspection operation may need additional queue.

      1 Changes Printed

     

    Feedback and Knowledge Base