Change the GL Reference for PO Receiving.
Use the PO#-Rel-Line no,-Item number as the reference instead of the current structure that shows the meaningless PO Doc #.
4
votes

Use the PO#-Rel-Line no,-Item number as the reference instead of the current structure that shows the meaningless PO Doc #.